📧 claire@jsltupe.com · ☎ +86 189 6300 3803 · MOQ from 1 piece · FOB Qingdao
Home›Blog›How to Clean UHMWPE Outrigger Pads After Jobsite Use
How-to Guide · JSLT GroundMat

How to Clean UHMWPE Outrigger Pads After Jobsite Use

Practical step-by-step guide based on field experience. Send your DWG and we quote within 24 hours.

Overview

This guide covers the practical steps to clean uhmwpe outrigger pads after jobsite use. JSLT GroundMat produces engineering plastic components in UHMWPE, HDPE, PA, POM and PTFE — full-process fabrication from raw sheet to CNC-machined parts.

Step-by-step procedure

  1. Scrape soil with plastic edge. Avoid steel scrapers — they gouge pad surface.
  2. Power wash with cold water. Cold water OK; hot water above 70°C softens UHMWPE.
  3. Inspect for cracks or gouges. Document any damage; replace pad if cracks visible.
  4. Dry before stacking. Wet pads in stack can adhere over weeks.
  5. Store flat and shaded. UV exposure over years degrades surface; shaded storage preferred.

Need help?

Our engineering team reviews drawings within 24 hours. We have shipped to 80+ countries across 4 continents and hold ISO 9001 certification.

Get a Quote in 24 Hours

Send your DWG/DXF/PDF/STEP files to claire@jsltupe.com — we reply within 24 h with unit cost, lead time, and FOB Qingdao shipping option.

📧 claire@jsltupe.com · ☎ +86 189 6300 3803 · MOQ from 1 piece · Quote on request

Contact Us