📧 claire@jsltupe.com · ☎ +86 189 6300 3803 · MOQ from 1 piece · FOB Qingdao
Home›Blog›How to Install UHMWPE Crane Outrigger Pads on Jobsite
How-to Guide · JSLT GroundMat

How to Install UHMWPE Crane Outrigger Pads on Jobsite

Practical step-by-step guide based on field experience. Send your DWG and we quote within 24 hours.

Overview

This guide covers the practical steps to install uhmwpe crane outrigger pads on jobsite. JSLT GroundMat produces engineering plastic components in UHMWPE, HDPE, PA, POM and PTFE — full-process fabrication from raw sheet to CNC-machined parts.

Step-by-step procedure

  1. Inspect ground. Remove debris; ground should be visibly flat and stable.
  2. Place pad centered under outrigger. Outrigger float must contact pad center within 100mm.
  3. Lower outrigger gradually. Watch for pad tilt; halt if soil yields beyond 25mm.
  4. Check level after load. Verify crane level post-stabilization.
  5. Document inspection. Photograph setup and ground condition for safety records.

Need help?

Our engineering team reviews drawings within 24 hours. We have shipped to 80+ countries across 4 continents and hold ISO 9001 certification.

Get a Quote in 24 Hours

Send your DWG/DXF/PDF/STEP files to claire@jsltupe.com — we reply within 24 h with unit cost, lead time, and FOB Qingdao shipping option.

📧 claire@jsltupe.com · ☎ +86 189 6300 3803 · MOQ from 1 piece · Quote on request

Contact Us