📞 +86-189-6300-3803 | 📧 claire@jsltupe.com | 🌐 Export to 80+ Countries
ISO 9001 · 18 Years Manufacturing
ground protection mats · HDPE GROUND PROTECTION MATS (4×8 FT STANDARD)

HDPE Ground Protection Mats (4×8 ft Standard)

Our flagship product. Standard 4×8 ft HDPE ground protection mats in 1/2 inch and 3/4 inch thickness, with anti-slip cleat pattern on both sides and integrated handle holes. Reusable across hundreds of deployment cycles. Used by wind energy contractors, utility line crews, oil & gas operators, and event production companies worldwide.

Get QuoteWhatsApp
HDPE Ground Protection Mats (4×8 ft Standard)

Specifications & MOQ

All SKUs are made-to-order from our own UHMWPE / HDPE / nylon production line. Send your DWG / DXF / PDF / STEP — we quote within 24 hours, MOQ from 1 piece.

ProductMOQMaterialImage
12.7mm Thick Heavy Equipment HDPE Temporary Road Mat 4x8 HDPE Ground Protection Track Mat1 pieceHDPE12.7mm Thick Heavy Equipment HDPE Temporary Road Mat 4x8 HDPE Ground Protection Track Mat
Temporary Ground Cover Mats Protection Ground Mat Swamp Excavator Mats1 kilogramHDPETemporary Ground Cover Mats Protection Ground Mat Swamp Excavator Mats
Recyclable PE UHMW Ground Protection Mat HDPE Temporary Road Panels1 pieceUHMWPE/HDPERecyclable PE UHMW Ground Protection Mat HDPE Temporary Road Panels
HDPE Extruded Ground Protection Mat with Logo Customized Size50 piecesHDPEHDPE Extruded Ground Protection Mat with Logo Customized Size
High Strength Yellow Black Anti-Slip Outrigger Pads Crane Leg Support1 pieceUHMWPE/HDPEHigh Strength Yellow Black Anti-Slip Outrigger Pads Crane Leg Support
HDPE Material Ground Protection Mats Temporary Road Construction Site1 kilogramHDPEHDPE Material Ground Protection Mats Temporary Road Construction Site

Technical Specifications

Material100% virgin HDPE (also recycled-content HDPE on request)
Standard Size4 × 8 ft (1220 × 2440 mm)
Thickness1/2 inch (12.7 mm) standard; 3/4 inch (19 mm) heavy duty
Weight per Mat~36 kg (1/2") / ~54 kg (3/4")
Load DistributionUp to 80-ton tracked crane (3/4" mats laid in pattern)
Surface PatternDiamond cleat both sides, anti-slip when wet
ColorBlack (UV stabilized) standard; safety yellow / orange / green on request
ConnectionIntegrated handle holes; optional steel link plates for mat-to-mat
Service Life5 – 10 years with normal handling
Stacking20 mats per pallet stack; ~360 mats per 40 HC FCL

Application Cases

Wind Farm Construction — Crane Pad Access Road

Wind energy contractor used 480 HDPE mats to create a 1.2 km temporary access road plus crane pads.

Read case →

Electrical Utility Line Maintenance — Boom Truck Access

Electrical utility company standardized on HDPE mats for off-road line maintenance after right-of-way damage claims.

Read case →

Oil & Gas Wellsite — Temporary Pad & Access Road

Oil & gas operator built an entire frac wellsite pad on HDPE mats — saved permanent gravel cost.

Read case →

Event Flooring — Concert, Festival & Sports Venue

Festival production company uses HDPE mats to protect grass venues during multi-day concerts.

Read case →

Frequently Asked Questions

How many mats do I need to support an 80-ton crane?

Typical pattern is 3 mats wide × 4 mats long under each track for tracked cranes, 2×2 under each outrigger for hydraulic cranes. Use 3/4 inch mats for 80-ton; 1/2 inch is sufficient for cranes up to ~25 tons. Soil bearing capacity matters — soft clay needs more mat coverage than firm sand.

Can the mats be linked together to form a continuous road?

Yes — we supply optional steel link plates that bolt through the mat handle holes, creating a continuous connected pathway. Not required for crane outrigger applications but useful for vehicle access roads.

How are 360 mats packed in a 40 HC container?

Mats are stacked vertically on edge in 20-mat blocks, then strapped. We palletize using heat-treated wood with corner protection. Full container load is ~17 tons of mats, well within container weight limits.

Recycled content vs virgin HDPE — which should I choose?

Virgin HDPE has the longest service life (10+ years) and best UV stability. Recycled-content HDPE is ~25 % cheaper but may have slightly shorter life and color variation. For long-term rental fleet operators we recommend virgin; for one-project use recycled is a reasonable choice.

Lead time for 200 mats?

20-25 days from PO confirmation, FOB Qingdao. Larger orders (~360 mats / 40HC FCL) ship in 25-30 days.

Request a Quotation

Tell us about your ground protection mats project. Our engineering team responds within 12 hours with technical specs, lead time and a tailored quotation.

Part of the JSLT Global Manufacturing Network · jslt-polymers.com jspolymers.com plasticos-ingenieria.com